Complete makeover included: New bathroom, interior paint and floor coverings with new light fixtures . Restoring the kitchen while keeping existing cabinets and counter tops, 2 new windows, new blinds, new faucets, minor roof repairs, new facia wraps, plumbing repairs to main drains, electrical repairs, and numerous other little repairs such as hauling tenant trash, yard clean up, tree trimming, door repairs, etc.
Each photo is a before and after of the same spot...some photos were taken during the tear out process had already begun.
Bathroom Floor had almost completely rotted out.
Sink and cabinet area was terrible, we removed the old sink and cabinets, rearranged the layout and made it serviceable, more spacious and useable while sticking to a tight budget.
The result was budget concious, quaint, useable and beautifully built bathroom.
We turned a dirty, abused and unsightly house into a clean, presentable and livable home, complete with new paint, light fixtures, plumbing and electrical repairs, new floors, and some new windows; as well as some exterior repairs.